
For a single site, a realistic answer is four to eight weeks from kickoff to go-live. Multi-site rollouts take longer and get scheduled site by site rather than all at once — trying to switch every location on the same day is where implementations go wrong.
The shape of it, broadly: a discovery stage where we walk your site, audit your current rules and scope the integrations you need, ending with an implementation plan you sign off on. Then a build stage — the rules engine gets configured, integrations get stood up, devices get procured, and you get a test environment to check it against how your business actually runs, not how a generic template assumes it runs.
After that, terminals get fitted on site by our consultants, the mobile app gets rolled out, and network and power get signed off before we leave. Then training — site managers, HR and payroll on the system itself, floor staff on the terminal in person, because a system nobody's shown how to use doesn't get adopted.
The honest caveat: timelines slip when the rules aren't settled going in. If shift premiums, overtime thresholds or absence policies are still being decided internally, that's worth resolving before build starts, not during it.


