
Yes — one system, one source of truth, across as many sites as you run. That's the short answer. The longer answer is what changes when you go from one location to several.
Your head office gets a single view instead of chasing separate spreadsheets, or separate instances of the same software, from each location. Shift rules can be set centrally and then varied by site where they genuinely need to differ — a factory floor and an office rarely run the same overtime policy, and the system should be able to hold both without becoming two separate systems that happen to share a login.
Rollout is where multi-site implementations either work or don't. We schedule site by site rather than switching everywhere on the same day, so each location gets terminals fitted, staff trained and issues caught before the next site goes live. It takes longer than a single-site rollout, but it means a problem at site three doesn't take down attendance tracking at sites one and two while it's being fixed.
The thing worth asking before you start: which rules genuinely need to be site-specific, and which are just inherited from however each site happened to do things before. Multi-site is a good moment to standardise the ones that don't need to differ.


